Long-lead expediting
A critical item tracking late against a fixed shutdown window, flagged while the window can still be replanned.

Oil & Gas
Oil & Gas is 163 agents written for an integrated oil and gas company. They know AFEs, joint-venture thresholds and permit-to-work, and anything touching a live process, a permit or an HSE incident goes to a person.
Built for
Built for an integrated oil and gas company with upstream exploration and production, midstream pipelines and terminals, and downstream refining and fuel marketing. They serve fuel distributors, industrial buyers, retail fuel stations, joint-venture partners and offtakers, and sell crude oil, natural gas and LNG, refined fuels and lubricants, and pipeline and terminal capacity.
Requisitions must be checked against the approved AFE, the delegation of authority and JV committee thresholds.
Every contractor needs safety pre-qualification, insurance and screening before work starts.
Bids are checked for technical and HSE compliance before price is even scored.
Production sharing contracts and host-government reporting leave no room for invented figures.
Inside the platform




The industry the agents know
Regulation
The agents keep to the rules your business already answers to. Each one becomes an approval step, a setting or a record your team can check.
These are examples from the markets Wersel works in, not a full list, and not legal advice. Your compliance team decides which rules apply to you, and sets the rules and limits the agents follow.

Reports are built from your production and hydrocarbon accounting systems, with each figure traced to its source. A missing figure is reported as missing, never estimated.
Thresholds are settings. A requisition or AFE change above one goes to the Joint Venture Manager.
Anything touching a live process, a permit to work or an HSE incident goes to a person. The agent prepares the record; a person decides.
Maintenance and spares work is tied to the asset register and its history, so each recommendation shows the records behind it.
Partners, agents and contractors are screened before onboarding. Anything incomplete or a possible match stops the process for compliance.
Your systems
Agents name no vendor. They connect to whichever system of each kind you already run, and read your data there.
Departments
163 agents across 11 departments, each handing its work to the right Oil & Gas approver.
| Department | What it covers | Agents | Link |
|---|---|---|---|
| Content | video, writing, imagery and localisation | 12 | See agents → |
| Customer | support, service and retention | 18 | See agents → |
| Design | product, brand and experience design | 10 | See agents → |
| Engineering | building, running and securing the technology | 20 | See agents → |
| Finance | bookkeeping, payables, receivables, payroll, close and planning | 19 | See agents → |
| HR | hiring, onboarding, people operations and learning | 14 | See agents → |
| Management | events, programmes, operations and leadership support | 12 | See agents → |
| Marketing | advertising, campaigns, SEO, social and lifecycle marketing | 18 | See agents → |
| Procurement | requisitions, sourcing, suppliers and contracts | 10 | See agents → |
| Product | planning, research, analytics and launches | 12 | See agents → |
| Sales | pipeline, deals, proposals and account growth | 18 | See agents → |
AI agents
From a real run
This is what the approver sees: the agent’s finished work, waiting for a decision.
Three requisitions for pump and compressor maintenance and spares on AFE-7741 (JV asset) total 278000 USD, with 450000 remaining against the 2400000 AFE and committed 1950000. Routing rests on the DoA settings and the split rule, which raise a suspected split with the 232000 contractor pair and the 278000 scope reaching the procurement-lead level. Missing: vendor and quote references, bids, sole-source reason, pre-qualification, partner consent, whether 1950000 includes these PRs, requester identity, and needed-by dates for 0415 and 0419. Once approved, the three PRs are released to the budget holder and procurement lead in order, with three bids run per PR and the AFE figure re-checked.
The approver can approve or edit and approve. Nothing is sent or changed until they do.
Use cases
Contractor services, materials and long-lead equipment checked against the AFE, the delegation of authority and JV thresholds.
Company documents, insurance, safety records and screening collected and checked before a contractor is activated.
Bids for contractor services and equipment packages checked for technical and HSE compliance before price is scored.
How the work flows
ERP finance, maintenance and supply
Permit-to-work and HSE incidents
Maintenance management (CMMS)
Contractor management portal
Decisions we model
Beside the agents, purpose-built models for the gaps between systems where the money leaks: expediting, spares, certification and frame agreements. Deployable fully on-premises.
How we scope an outcome →A critical item tracking late against a fixed shutdown window, flagged while the window can still be replanned.
One qualified vendor holding most of a critical spares list, quantified across the portfolio rather than felt anecdotally.
The part an asset is waiting on, already in another yard under a different description in a different system.
Heat numbers on the mill certificate disagreeing with what was delivered, caught at the gate rather than at installation.
Berth congestion pushing discharge past laytime, forecast far enough ahead to re-sequence.
Call-offs priced above the agreement that was supposed to govern them, across thousands of lines nobody re-checks.
Connected and governed
Read in place, never copied: ERP materials & maintenance · Asset management · Supplier portal · Expediting & inspection · Freight & marine logistics · Contract repository · Warehouse & yard.
Tell us the decision you want to improve. We’ll come back within one working day.