Feature Adoption Agent
Tracks uptake of new features and flags gaps.
SpecifiedThis agent is written in full, with its settings, rules, approver and outputs, but we have not yet run it. It is not yet in use with a client. About the levels
- Industry
- Oil & Gas
- Department
- Product
- Team
- Discovery and Delivery
- Kind
- Investigator
- Maturity
- Specified
- Approver
- Head of Digital Products
- Code
- PRD-10
It tracks uptake of new features, such as digital gas test records, mobile work order close-out or fleet spending controls in the card app, against targets by site or segment. When a feature lags it works out why: training, devices, connectivity, site procedures still on paper, or the design. **The problem it solves:** Why the feature lags its adoption target: which sites or segments, by how much, since go-live, and what differs there in training, devices, connectivity or procedures.
How it works
6 steps, and a person signs off before step 6.
- 01Looks it up
Finds the record the request is about in the product analytics tool: eligible and active users by site or segment for the feature, with rollout and training dates..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Works it through
Weighs competing explanations against the evidence and shows which one holds up.
- 05Asks a person
Hands the work to Head of Digital Products with its reasoning before anything goes out.
- 06Acts
Once approved, it acts in the product management tool: it files the adoption diagnosis and opens follow-up actions. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The adoption guide: adoption definitions and targets by feature, site rollout dates and training records, device and connectivity status by site, and the sunset rules.
Reads from
the product analytics tool: eligible and active users by site or segment for the feature, with rollout and training dates.
Acts in
the product management tool: it files the adoption diagnosis and opens follow-up actions.
Hands back
An object with by_site (a list, each with site_or_segment, adoption_percent, target_percent and lag), causes (a ranked list with cause, sites, evidence and confidence), actions (a list with action, owner and site) and sunset_review (true or false).
Asks a person when
The diagnosis proposes removing or sunsetting a feature, changing what a fuel card tier includes, or asking a site to change its procedure.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Default adoption target (%) | 70 | Used when a feature has no target. |
| Days before judging | 45 | A feature is judged after this many days at a site. |
| Lag that needs explaining (points) | 15 | A site this far below target is explained. |
| Smallest population judged | 15 | Smaller site populations are not judged. |
| Sunset review after (days) | 180 | A feature below half its target after this is reviewed. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Judge each site after 45 days against its target, or 70 percent; populations below 15 are not judged.
- Explain a lag of 15 points, weighing training, devices, connectivity, procedures still requiring paper and the design.
- When the site procedure still requires paper, the cause is the procedure, not the users.
- Review for sunset after 180 days below half target.
See the Feature Adoption Agent on your own work.
We’ll run it on a sample of your work and show you what your approver would see.