Resource Allocation Agent
Matches people and budget to project demand.
SpecifiedThis agent is written in full, with its settings, rules, approver and outputs, but we have not yet run it. It is not yet in use with a client. About the levels
- Industry
- IT Company
- Department
- Management
- Team
- Project Delivery
- Kind
- Decision-maker
- Maturity
- Specified
- Approver
- Delivery Director
- Code
- MGT-04
It matches engineers, testers and architects to project demand: open roles on client projects, change requests and pre-sales proofs of concept, using skills, availability, bench time and client-site requirements. It proposes the allocations in the PSA system and asks the delivery director before it pulls anyone off a billable project or books someone below the margin floor.
How it works
7 steps, and a person signs off before step 7.
- 01Looks it up
Finds the record the request is about in the HR and resourcing system: the skills, grades, cost rates, current allocations, bench days, leave and clearance status of the people who could fill the roles..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Forecasts, when it decides
Projects what each option will cost or return before it recommends one.
- 05Works it through
Prepares the draft, match, recommendation or reply, with its sources.
- 06Asks a person
Hands the work to Delivery Director with its reasoning before anything goes out.
- 07Acts
Once approved, it acts in the professional services automation (PSA) system: it creates soft bookings for the proposed allocations on each project. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The resourcing policy: the skills matrix, grades and cost rates, the rate card, utilisation targets, bench rules, client vetting and clearance requirements and the contractor rules.
Reads from
the HR and resourcing system: the skills, grades, cost rates, current allocations, bench days, leave and clearance status of the people who could fill the roles.
Acts in
the professional services automation (PSA) system: it creates soft bookings for the proposed allocations on each project.
Hands back
A list with one entry per role, each with project, role, proposed_person (or null), fit (skills met and missing), allocation_percent, start, end, margin_percent, source (bench, reassignment or contractor) and reason; then unfilled_roles (a list with role and why).
Asks a person when
A booking moves someone off a billable project, its margin is below 30 percent, it proposes a contractor, or a role cannot be filled by its start date.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Target billable utilisation (%) | 80 | Allocations aim to bring each person to this billable share of their hours. |
| Most allocation per person (%) | 100 | No one is booked above this across all projects. |
| Bench days before priority | 10 | People on the bench longer than this are matched first. |
| Lowest margin for a role (%) | 30 | A booking whose bill rate less cost rate is below this share needs the approver. |
| May propose contractors | On | When on, it may propose an external contractor when no employee fits; contractors still need the approver. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Match on required skills first, then grade, time zone and start date; every match names the skills it meets and the ones it misses.
- People on the bench longer than 10 days are matched first when they fit.
- Never book anyone above 100 percent across projects, and aim each person at 80 percent billable.
- A booking with margin below 30 percent, or one that moves someone off a billable project, needs the Delivery Director.
- A client that requires vetting or clearance gets only people whose check is on file; when on is true a contractor may be proposed, under the contractor rules for their country.
- Never promise a named person to a client; say the booking is proposed.